Eclipse e4 Project 2010.0.0

2010.0.0

Description

Last revised 15:00 ET July 28, 2010.

Please send comments about this plan to thee4-dev@eclipse.orgdeveloper mailing list.

This draft document lays out the feature and API set for the next feature release of the Eclipse e4 project, designated the July 2010 release.

Plans do not materialize out of nowhere, nor are they entirely static. To ensure the planning process is transparent and open to the entire Eclipse community, we (the e4 team) post plans in an embryonic form and revise them throughout the release cycle.

The first part of the plan deals with the important matters of release deliverables, release milestones, target operating environments, and release-to-release compatibility. These are all things that need to be clear for any release, even if no features were to change.

The remainder of the plan consists of plan items for all of the component areas under the e4 Project. Each plan item covers a feature or API that is to be added to the e4 Project deliverables, or some aspect of the e4 Project that is to be improved. Each plan item has its own entry in the Eclipse bugzilla database, with a title and a concise summary (usually a single paragraph) that explains the work item at a suitably high enough level so that everyone can readily understand what the work item is without having to understand the nitty-gritty detail.

Not all plan items represent the same amount of work; some may be quite large, others, quite small. Some plan items may involve work that is localized to a single component; others may involve coordinated changes to several components; other may pervade the entire project. Although some plan items are for work that is more pressing than others, the plan items appear in no particular order.

Fixing bugs, improving test coverage, documentation, examples, performance tuning, usability, etc. are considered routine ongoing maintenance activities and are not included in this plan unless they would also involve a significant change to the API or feature set, or involve a significant amount of work. The intent of the plan is to account for all interesting feature work.

The current status of each plan item is noted:

  • Committed plan item - A committed plan item is one that we have decided to address for the release.
  • Proposed plan item - A proposed plan item is one that we are considering addressing for the release. Although we are actively investigating it, we are not yet in a position to commit to it, or to say that we won't be able to address it. After due consideration, a proposal will either be committed or deferred.
  • Deferred plan item - A reasonable proposal that will not make it in to this release for some reason is marked as deferred with a brief note as to why it was deferred. Deferred plan items may resurface as committed plan items at a later point.