Eclipse JNoSQL 1.0.1

Release Date
Deliverables
  1. Analysis and Review:

    • Review the list of fixes and changes mentioned in the request.
    • Understand the scope and impact of each fix/change on the project.
    • Identify any potential risks, dependencies, or conflicts associated with the changes.
    • Prioritize the fixes/changes based on their importance and impact.
  2. Update Injectable Beans:

    • Add a no-args constructor to the injectable beans as specified.
    • Update the affected classes to utilize the newly added constructor.
    • Test the changes to ensure the beans are instantiated correctly.
  3. Fix Lazy Loading Metadata in EntityMetadata:

    • Analyze the existing code and identify the causes of lazy loading issues.
    • Implement the necessary fixes in the EntityMetadata class to resolve the lazy loading problems.
    • Verify the changes by testing the lazy loading functionality with different scenarios.
  4. Fix ParameterMedataData NullPointerException:

    • Analyze the ParameterMedataData class and its dependencies.
    • Implement the required logic to prevent the NullPointerException when building with a Parameter lacking @Column or @Id annotations.
    • Verify the fix by running relevant test cases.
  5. Fix Reflections.getConstructor() Method Logic:

    • Analyze the Reflections.getConstructor() method and its behavior.
    • Modify the logic to correctly detect constructors with parameters annotated with @Id or @Column.
    • Test the modified logic with different scenarios to ensure its accuracy.
  6. Remove Unnecessary Attributes and Constructor Arguments:

    • Review the CassandraColumnManagerFactory class and its dependent classes.
    • Identify and remove any unnecessary attributes and constructor arguments.
    • Ensure that the removed components do not affect the functionality of the classes.
    • Validate the changes by running relevant tests.
  7. Update Dependencies:

    • Update the Cassandra driver to version 4.16.0.
    • Update DynamoDB to version 2.20.98.
    • Update Elasticsearch to version 8.8.2.
    • Update Hazelcast to version 5.3.1.
    • Update the MongoDB driver to version 4.10.1.
    • Update the Apache Solr driver to version 9.2.1.
    • Update Testcontainer to version 1.18.3.
    • Update the project configuration and code to utilize the new versions.
    • Conduct extensive testing to ensure compatibility and functionality with the updated dependencies.
  8. Integration and System Testing:

    • Conduct integration testing to verify the compatibility and interaction of the updated components.
    • Perform system testing to ensure that all functionalities and features are working as expected.
    • Validate the fixes and changes against predefined acceptance criteria.
    • Identify and address any issues or defects discovered during testing.
  9. Documentation and Release:

    • Update the project documentation, including the release notes, user manuals, and any relevant technical documentation.
    • Prepare the necessary release artifacts and packages.
    • Coordinate with the relevant stakeholders for the release plan.
    • Deploy the updated project to the production environment.
  10. Post-Release Support:

    • Monitor the production environment for any issues or performance problems.
    • Provide timely support and bug fixes for any reported issues.
    • Conduct a post-release review to gather feedback and identify areas of improvement.